Site partially uploaded, please check back again soon.
close [X]
Uis

Profitable Phase 1 processing plant

Profitable pilot plant in full operation. Nameplate production of 720tpa has been achieved and the plant is profitable on tin alone.

Significant by-product potential from lithium and tantalum and the Phase 2 expansion of tin concentrate production to 1300tpa makes this a dramatically scalable project with potential to also become a global lithium supplier.

Globally significant mineral resource estimate at Uis

  • > 180 mineralized pegmatites mapped within 5 km of the current operation
  • Same mineralogical composition – typical Uis pegmatites
  • Near surface intersection of 67 m on W17 pegmatite
  • Significant resource upside potential
MRE of Tin within
the V1 and V2 Pegmatites
MRE of Ancillary Elements within the V1 and V2 Pegmatites
MeasuredIndicatedInferredTotalInferredInferred
CommoditySnSnSnSnLi20Ta
Grade0.139%0.136%0.130%0.134%0.63%85 ppm
Tonnes of Ore21 540 00013 050 00036 950 00071 540 00071 540 00071 540 000
Maintained Metal (t)29 88917 76547 76595539450 265**6091