Uis
Profitable Phase 1 processing plant
Profitable pilot plant in full operation. Nameplate production of 720tpa has been achieved and the plant is profitable on tin alone.
Significant by-product potential from lithium and tantalum and the Phase 2 expansion of tin concentrate production to 1300tpa makes this a dramatically scalable project with potential to also become a global lithium supplier.

Globally significant mineral resource estimate at Uis
- > 180 mineralized pegmatites mapped within 5 km of the current operation
- Same mineralogical composition – typical Uis pegmatites
- Near surface intersection of 67 m on W17 pegmatite
- Significant resource upside potential

MRE of Tin within the V1 and V2 Pegmatites | MRE of Ancillary Elements within the V1 and V2 Pegmatites | |||||
---|---|---|---|---|---|---|
Measured | Indicated | Inferred | Total | Inferred | Inferred | |
Commodity | Sn | Sn | Sn | Sn | Li20 | Ta |
Grade | 0.139% | 0.136% | 0.130% | 0.134% | 0.63% | 85 ppm |
Tonnes of Ore | 21 540 000 | 13 050 000 | 36 950 000 | 71 540 000 | 71 540 000 | 71 540 000 |
Maintained Metal (t) | 29 889 | 17 765 | 47 765 | 95539 | 450 265** | 6091 |